Your people —Vinod · Tue, 1 SeptRohit · Wed, 2 SeptDeepak · Thu, 3 SeptMeera · Mon, 7 SeptShubhangiPrakashRamesh
Where Meera stands
1At or near where the calendar says they should be.
- 41%vs 40%+1The work under it
Requests closed without reaching me: 41% → 75%
41 % → 55 % → 75 % · read last night · nothing is being done about it
Their week is 93% booked (42 hours) — more than the rest of the team. The console, the joining list, and every request that reaches her desk. The whole week
Open with these
0Nothing is broken, blocked or overdue. Ask about the work they want to do next.
What was agreed last time
Meera to bring the four roles with what each one costs to leave open
Brought on the 25th. Maintenance is the expensive one.
Meerakept
In Meera's own words
No check-in since the last one-to-one.
This time
Closed since Mon, 24 Aug
Nothing closed.
Open
2- A named second for dispatch (Mahesh, under Suresh) and for filings (Girish, under Ramesh), agreed with Vinod and Anildue Thu, 10 Sept
- Migration date per module — CRM firstdue Tue, 8 Sept