Rejections

demowho and where

Not a feature. Sign-in decides both of these; until then, this does.

Demo map
Operations

Rejections

Orders and projects. The same thing, promised differently.

Rejections and non-conformances

2

Hole pitch out of tolerance2 times, lots 4471 and S-0719. One cause, two customers.

  • NCR-4471Bracket MB-114 · lot 4471openraised by Sundaram Auto Systems12 Aug

    180 of 2400 rejected · 75,000 ppm · rework · ₹41,000

    Cause Hole pitch out of tolerance — drill jig drifted after the die change

    Corrective Jig re-set and verified; first-piece check added after every die change. Written CA to Meridian SQA still owed.

  • NCR-SHARMA-JULBracket MB-114 · lot S-0719closedraised by Sharma Traders22 Jul

    40 of 600 rejected · 66,667 ppm · scrap · ₹72,216

    Cause Hole pitch out of tolerance — same jig, before the fix

    Corrective Credit note MA/CN/26-27/007 raised; forty pieces scrapped.

  • NCR-INT-0821Housing H-22 · lot B-0819opencaught at final inspection21 Aug

    12 of 300 rejected · 40,000 ppm · return to supplier · ₹9,600

    Cause Porosity at the boss — casting supplier's batch 7

    Corrective Twelve returned to the foundry; batch 7 quarantined. Caught at final inspection — nothing left the gate.