Who
The work-facing half. The rest is theirs.
- Name
- Pravin Salunkhe
- Role
- Tool Room In-charge
- Unit
- Production
- Reports to
- Ganesh Bhosale
- Since
- 1 Oct 2014
- Work email
- pravin.salunkhe@mehtaauto.in
- Mobile
- +9198221XXX07
What I can do, and want to
From their joining conversation.
Have
fixture design · grinding · tool inventory · vendor coordination
Want
CAD · tool cost budgeting
Aspiration
Wants to learn design so the tool room stops depending on outside drawings. · shared with your manager only
My goal
One goal, drafted for you and accepted by you. The score comes from its instrument, never from a tick.
A tool change stops costing the shift agreedAverage tool change: 52 → 30 minutes · Stoppages caused by a tool: 9 → 3 a monthOpen their goals
0 open items of work
Leave
From the ledger, entry by entry.
- Earned leave10.0 days · 5 entries
- Casual leave8.0 days · 1 entries
- Sick leave10.0 days · 1 entries